Contractors check the edging of a convrete test lane poured  on Sept. 1 for the Joint Base Pearl-Harbor Hickam F-22 Fighter Alert Facility project.
TAMUNING, GUAM (Sept. 19, 2020) - USACE led a virtual site walkthrough with contractor Hensel Phelps to discuss requirements for providing additional power capability for  rooms in Guam Memorial Hospital (GMH) to meet the emergent need for increased patient capacity and care capability in Guam.
The U.S. Army Corps of Engineers (USACE) Honolulu District completed an Engineering Documentation Report Aug. 6 that provides the new recommended plan for the Ala Wai Flood Control Project.
The U.S. Army Corps of Engineers (USACE) Honolulu District completed an Engineering Documentation Report Aug. 6 that provides the new recommended plan for the Ala Wai Flood Control Project.
The U.S. Army Corps of Engineers Honolulu District welcomed new leadership today as Lt. Col. Eric S. Marshall (right) assumed command from Lt. Col. Kathryn P. Sanborn (center left) during a modified change of command ceremony at Fort Shafter’s Palm Circle Gazebo
The U.S. Army Corps of Engineers Honolulu District welcomed new leadership today as Lt. Col. Eric S. Marshall (right) assumed command from Lt. Col. Kathryn P. Sanborn (center left) during a modified change of command ceremony at Fort Shafter’s Palm Circle Gazebo.
The U.S. Army Corps of Engineers Honolulu District welcomed new leadership today as Lt. Col. Eric S. Marshall (right) assumed command from Lt. Col. Kathryn P. Sanborn (center left) during a modified change of command ceremony at Fort Shafter’s Palm Circle Gazebo.
The U.S. Army Corps of Engineers Honolulu District welcomed new leadership today as Lt. Col. Eric S. Marshall (right) assumed command from Lt. Col. Kathryn P. Sanborn (center left) during a modified change of command ceremony at Fort Shafter’s Palm Circle Gazebo.
. In the photo, Tim Phillips (second from left) participated in a site visit of the C2F project in March 2020 for the 54th Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers Lt. Gen. Todd Semonite (center). (photo taken during an engagement prior to enforcement of COVID-19 social distancing)
Jessica Podoski (second from left) and the American Samoa climate change working group pause for a photo with U.S. Congresswoman Aumua Amata (center) during the October 2019 workshop for the American Samoa Climate Related Vulnerability Assessment for Transportation Infrastructure Study.
Honolulu District's site assessment team conducted its first-ever virtual technical site assessments May 6 and May 7 with Hawaii County officials seeking to have the North Hawaii Community Hospital and Kona Community Hospital medical locations evaluated for potential upgrades to Alternate Care Facilities.  The virtual site assessment is unique in that teams normally travel to FEMA, state and county-selected sites to conduct the assessment in  person.  These two virtual assessments were the first conducted by Honolulu District during the COVID-19 Pandemic response.
Honolulu District's site assessment team conducted its first-ever virtual technical site assessments May 6 and May 7 with Hawaii County officials seeking to have the North Hawaii Community Hospital and Kona Community Hospital medical locations evaluated for potential upgrades to Alternate Care Facilities.
Honolulu District's site assessment team conducted its first-ever virtual technical site assessments May 6 and May 7 with Hawaii County officials seeking to have the North Hawaii Community Hospital and Kona Community Hospital medical locations evaluated for potential upgrades to Alternate Care Facilities.
Honolulu District's site assessment team conducted its first-ever virtual technical site assessments May 6 and May 7 with FEMA, state of Hawaii, Department of Health and Human Services, and Hawaii County officials seeking to have the North Hawaii Community Hospital and Kona Community Hospital medical locations evaluated for potential upgrades to Alternate Care Facilities.
Representatives from the U.S. Army Corps of Engineers (USACE), Honolulu District, the government of Guam, FEMA, NAVFAC Marianas, U.S. Department Health and Human Services, 18th MEDCOM, Dept. of Homeland Security, Guam Air National Guard, and Guam Fire Dept. conducted a site assessment of the Lotte Hotel Guam in Tumon April 30 for potential use as an Alternate Care Facility.
Engineers from USACE - Honolulu District, NAVFAC Marianas, the government of Guam, FEMA, Dept. of Homeland Security, Guam Air National Guard, and Guam Fire Dept. evaluated the Hafa Adai Bingo Hall and the United Airlines Hangar at Antonio B. Won Pat International Airport in Tamuning, and the Lotte Hotel in Barrigada April 29 for suitability as an Alternate Care Facilities.
Engineers from USACE - Honolulu District, NAVFAC Marianas, the government of Guam, FEMA, Dept. of Homeland Security, Guam Air National Guard, and Guam Fire Dept. evaluated the Hafa Adai Bingo Hall and the United Airlines Hangar at Antonio B. Won Pat International Airport in Tamuning, and the Lotte Hotel in Barrigada April 29 for suitability as an Alternate Care Facilities.
USACE-Honolulu District, the government of Guam, FEMA, NAVFAC Marianas, U.S. Department Health and Human Services, and 18th MEDCOM conducted a site assessment April 22 of Okkodo High School  in Dededofor potential future use as an Alternate Care Facility.
USACE-Honolulu District, the government of Guam, FEMA, NAVFAC Marianas, U.S. Department Health and Human Services, and 18th MEDCOM conducted a site assessment April 22 of Okkodo High School  in Dededofor potential future use as an Alternate Care Facility.
Representatives from the U.S. Army Corps of Engineers (USACE), Honolulu District, the government of Guam, the Federal Emergency Management Agency (FEMA), U.S. Department Health and Human Services, and 18th MEDCOM conducted a site assessment April 22 of the Guam Basketball National Training Center in Tiyan for potential future use as Alternate Care Facility.
Representatives from the U.S. Army Corps of Engineers (USACE), Honolulu District, the government of Guam, the Federal Emergency Management Agency (FEMA), U.S. Department Health and Human Services, and 18th MEDCOM conducted a site assessment April 22 of the Guam Basketball National Training Center in Tiyan for potential future use as Alternate Care Facility.
Representatives from the U.S. Army Corps of Engineers (USACE), Honolulu District, the government of Guam, the Federal Emergency Management Agency (FEMA), NAVFAC Marianas, U.S. Department Health and Human Services, and 18th MEDCOM conducted a site assessment April 22 of the John F. Kennedy High School gynasium in Tamuning for potential future use as Alternate Care Facility.

Frequently Asked Questions

Collapse All Expand All

The public is encouraged to communicate with their locally elected leaders, City and County of Honolulu, and the state of Hawaii. The Honolulu District is in constant communication with our partners and the Corps welcomes the opportunity to answer specific project questions.  Once an agreement is in place between USACE and our non-Federal partners, formal channels will be established for the public to communicate questions or concerns.

 If you have a question for USACE about the project, please email them to AlaWaiFloodProject@usace.army.mil

A partnership agreement will be signed with our non-Federal Partner, which may be the state of Hawaii, the City and County or both. Within that agreement is a requirement to maintain the project into perpetuity in accordance with the project guidelines.  As such, it will be inspected annually by USACE who will provide a report to the sponsor to ensure project features are in good working order and ensure resiliency during a storm event. Operations and maintenance is an integral part of the overall project design. Design development includes safety assurance reviews by the USACE Dam Safety Center and technical reviews to ensure a level of safety and operability.  The structures will also be constructed to meet Hawaii Dam Safety requirements so that the non-Federal Partner can maintain the project features in a way that will ensure the safety of the community and the project.

With the increased frequency of storms in the Pacific, the geographic nature of the watershed, the increased development of the watershed, and the unique micro-climates within the watershed, there are significant flood risks to the people in the community, damage to the infrastructure, and risks to the people who work in and visit Waikiki.  This project seeks to implement an integrated system of project features that operate together to reduce those risks.  In areas that are not provided direct protection, a warning system will be constructed that will provide an opportunity for residences to be proactive during an event.  Hurricane Lane (2018) was a near miss, however, with the increasing number of storms and intensity of those storms, this project is necessary to protect the community, the infrastructure, and the economy from the risks of those future storms.  The intent of the appropriating legislation and the project team has been to work as quickly as possible to ensure that protection is in place before a major storm arrives.

The objective of this project is to reduce the damages and risks associated with flooding in the Ala Wai Watershed. The project study examined many different alternatives and measures, maximizing the use of public lands where feasible.  The project was developed to minimize the impact to private lands and maximize the use of public lands, but some impacts to private lands are unavoidable.  The project itself has been authorized by Congress. While minor changes to the size, scale, and precise location of the project features may occur, the project is the recommended plan included in the Feasibility Report.  

Preliminary designs and real estate requirements are included in the Feasibility Report, available on the USACE website (https://www.poh.usace.army.mil/Missions/Civil-Works/Civil-Works-Projects/Ala-Wai-Canal/). 

Because the designs for the project are not complete, it is inappropriate to speculate on the exact location and size of the project features. USACE and our partners will complete data collection at specific project sites to further inform the design.  During the Feasibility study, the state of Hawaii Department of Land and Natural Resources (DLNR) encouraged all private homeowners to participate in public meetings and comment periods if their property was identified as potentially falling within the footprint of the project area.  Rights of entry to public and private property were requested in October 2018 for a preliminary data gathering exercise, and additional rights of entry will be requested of private landowners in 2019 to make additional data gathering efforts to further refine project designs.  Acquisition of private lands is highly regulated under Federal law and is the responsibility of the non-Federal partner.

The project is expected to increase capture of sediment and debris before they reach the Canal, and therefore it is not expected to increase the need for dredging. Dredging was considered as a measure to increase the Canal’s capacity; however, the dredging would need to be maintained to provide ongoing flood protection, and the maintenance requirements are extremely high. As such, this measure was dropped from consideration. The flood modeling is based on the capacity of the Canal following the last dredging event. The DLNR periodically dredges the Canal and is currently assessing the timing for the next maintenance dredging event.

If understood correctly, this is in reference to how a potential multipurpose basin at Kanewai Field will impact your neighborhood, specifically, Koali Road. The multipurpose basin at Kanewai will be designed to divert water above a certain level into the field which will have a levee constructed of an earthen berm with armored rock beneath the grass.  The water will be diverted through an armored spillway where the Manoa Stream makes the curve by the baseball diamond.  Then the water will gather in the field and there will be an outlet sized small enough to control the outflows back into Manoa stream down by the end of Koali Road at the corner of the field.  When there is no storm event the field will continue to be used for its recreational purposes, and will now have an approximately 7' tall sloped earthen berm around the perimeter.  If I could give you a better visual, it will look something like an amphitheater looking down onto the baseball fields. The levee will be sized to detain a 100 year event, which is an extreme event so as to provide protection to Hokulani School and the surrounding neighborhood without inducing the risk.  An example to show you the level of protection is this:  The 2004 Manoa Flood that caused millions of dollars in Damage was considered a 25 year event.  Hurricane Lane which was forecast for 12" over a 24 hour period, and even more over the duration was forecast to be a 50 year event.  We are currently refining data and working with the City and County of Honolulu on developing our team and path forward.  One of the first steps after that will be to hold a community meeting to explain where the project is at and where we would like to go.  Community engagement and participation is the only way that this project will be successful in its intent; which is to provide protection to the community, the infrastructure, and the economy within the Ala Wai Watershed.

The 50 years is used in the feasibility study for the economic period of analysis, benefits vs. Costs.  After construction the City and County will receive an Operational Manual that includes repairs, rehabilitations, and replacement information to help the City and County maintain the project to its fullest.  Cost estimates for operation & maintenance were factored into the feasibility study and provided to the sponsor for budgeting and planning purposes.  While the economic period of analysis used is 50 years, USACE flood control projects across the nation have been functioning as designed for over 50 years.

People are encouraged to communicate with their locally elected leaders, City and County of Honolulu, and the state of Hawaii. The Honolulu District is in constant communication with our partners on this project and welcomes specific project questions. Once an agreement is in place between USACE and our non-Federal partners, formal channels will be established for the public to communicate questions or concerns.

There was significant public participation and outreach from 2004 to 2015 to meet the Federal National Environmental Policy Act (NEPA) requirements and also to follow the Hawaii state environmental compliance policies to the extent possible. The U.S. Army Corps of Engineers and Hawaii Department of Land and Natural Resources (DLNR) held a public meeting, presentation and open comment session with the public during the public review period on Sept. 30, 2015, which was attended by approximately 180 people. The public review produced written comments from 64 individuals and organizations, which USACE and DLNR provided individualized written responses. Since 2012 the Feasibility Study Report documents 44 other specific engagements with stakeholders including open houses, focus groups, and specific agency outreach.  Prior to 2012, there was also a significant amount of outreach documented in the Feasibility Study Report, however, this was during a phase of the study which focused on multiple project purposes (ecosystem restoration, flood risk management), so most of the material in the Feasibility Study Report is centered on the period after 2012 when the study was re-scoped to focus exclusively on flood risk management. The U.S. Army Corps of Engineers-Honolulu District worked in cooperation with both the City and County of Honolulu and the state of Hawaii on developing the Feasibility Study, community outreach, and developing the recommended plan.  Any party who submitted comments during the public review of the document received a written response to their specific comments from USACE and the State DLNR.  

The U.S. Army Corps of Engineers, the state of Hawaii and the City and County are working together on the layout, design, and level of protection. The design was approved for a flood wall because of space constraints, and the need to protect the surrounding areas from riverine flood drainage and sea level rise in the Ala Wai Canal.  People are encouraged to communicate their concerns and suggestions to the project partners as they understand our requirements and boundaries of authority. Decisions will be made in cooperation with our partners.

The appropriation received from Congress is an emergency appropriation to invest in projects located in areas prone to flooding that was determined to be economically justified and environmentally compliant. There is no expiration of funds provided under PL 115-123, for the Long Term Disaster Recovery Investment Program.  It is at the discretion of the Congress and Assistant Secretary of Army for Civil Works to reallocate funding from those projects if projects do not proceed. 

1 CFS = ~449 gallons/minute

The current plan is to elevate the cart path around the Ala Wai Golf Course with a passive flood gate that will still allow access in and out of the golf course. We will have more specific details later this month (February 2019) after our in-depth modeling is complete.

It is USACE policy to integrate climate change preparedness and resilience planning and actions in all activities for the purpose of enhancing the resilience of our built and natural water-resource infrastructure and the effectiveness of our military support mission, and to reduce the potential vulnerabilities of that infrastructure and those missions to the effects of climate change and variability. USACE shall continue undertaking its climate change preparedness and resilience planning, in consultation with internal and external experts and with our districts, divisions, and Centers, and shall implement the results of that planning using the best available – and actionable – climate science and climate change information. USACE is on the forefront of federal construction agencies in integrating climate change (including sea -level change) into project planning and climate change adaptation into project design, construction, and repair. Honolulu District works closely with state and local partners to provide a better understanding of (and ways to reduce) erosion, within our missions and authorities.

A partnership agreement will be signed with our non-Federal Partner, which may be the state of Hawaii, the City and County or both. Within that agreement is a requirement to maintain the project into perpetuity in accordance with the project guidelines.  As such, it will be inspected annually by USACE who will provide a report to the sponsor to ensure project features are in good working order and ensure resiliency during a storm event. Operations and maintenance is an integral part of the overall project design. Design development includes safety assurance reviews by the USACE Dam Safety Center and technical reviews to ensure a level of safety and operability.  The structures will also be constructed to meet Hawaii Dam Safety requirements so that the non-Federal Partner can maintain the project features in a way that will ensure the safety of the community and the project.

The U.S. Army Corps of Engineers has been authorized to move forward from the Feasibility Phase to the Design and Construction Phase, meaning the project is economically justified and environmentally compliant and has received authorization from Congress for construction.  The USACE Honolulu District has been working with the State and City and County of Honolulu to identify the appropriate non-Federal partner to move the project into the Design and Construction Phase.  The state of Hawaii, City and County of Honolulu, and USACE Honolulu District will continue further community involvement after the project sponsor has been identified and agreements have been reached for partnership.  In the meantime, USACE Honolulu District is working to refine data collected during the Feasibility Phase through site- specific surveys; as appropriate we will communicate with Stakeholders in cooperation with the State and City and County. The intent has been to assist the City and County of Honolulu and state of Hawaii in implementing this project to protect the people, infrastructure, and economy within the Ala Wai Watershed.