Expiration date: 3/12/2015
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. The applicant’s stated purpose is to allow the current class of multi-purpose auxiliary support ships (T-AKE class) safe navigation to X-Ray Wharf, Naval Base Guam’s designated supply wharf, and to provide adequate berthing facilities that meet current design criteria.The Navy proposes to construct a new 35’ X 742’ (0.6 acre) closed cell sheet pile wharf with mooring and fendering systems seaward of the existing North Berth (Berth 1) of X-Ray Wharf. The area between the new sheet piling and the existing wharf face would be backfilled and capped with a concrete deck platform.